Companies › Black Hills Energy
Black Hills Energy
Data center projects in our tracker that name Black Hills Energy as the utility or power supplier. The name is matched to the field exactly as our sources report it; see each project for details.
Projects2
States1
Known capacitynot reported
Blocked / withdrawn0
Projects
| Project | Location | Status | Role | Latest |
|---|---|---|---|---|
| Meta Cheyenne Data Center Listed as: Cheyenne Light (Black Hills Energy) | Laramie County, WY | under construction | Utility | 2026-10 Meta info sheet (accessed 2026-10-16): jobs listed 'once completed' |
| Project Tembo (Cheyenne; ex-Crusoe/Tallgrass) Listed as: Black Hills Energy + private microgrid | Laramie County, WY | approved | Utility | 2026-09-17 Crusoe paused and exited; Google now leads $17B four-building campus, construction expected late 2026 |
States
Sources
- https://datacenters.atmeta.com/asset/cheyenne-data-center-info-sheet/
- https://www.wyomingnews.com/laramieboomerang/news/google-outlines-17b-project-tembo-data-center-campus-planned-for-laramie-county/article_1c1c3912-f785-480c-9ed6-aa005fb3418a.html
- https://www.wyomingpublicmedia.org/natural-resources-energy/2026-09-17/google-promises-to-replenish-local-watershed-at-open-house-in-cheyenne
See an error, or a project we link to the wrong company? Request a correction.